Product Information:
-
BGL classification C.0.10.0180 Norms EN 14439 Max. load capacity 8.5 t Max. jib radius 60.0 m Rope falls 2
-
Hoisting gear: Type 845 FU 875 FU Power kW 45 75 Current A 88 143 Crane: Operating current A 90 130 Peak current A 152 221 Supply line: Cross Section A mm² 35 | 50 50 | 70 Max. fuse A 100 | 100 125 | 125 Max. length S2 + S3 m 158 | 226 155 | 217 Connected power kVA 62 90 min. required generator power kVA 124 180
-
Main Components
25 m basic jib with trolley gear. Extensions up to 60 m radius in 2,5 m steps. Slewing frame with driver’s cabin, control cabinet, slewing gear, ball race bearing with central lubrication unit and slipring system. Counterjib with hoisting platform and counterweights.
Drive Technique
All drives frequency controlled squirrel cage motors, fully thermal protected. Hoisting winches Hw 845 FU or Hw 875 FU.
Slewing gear with electrically operated weathervaning device.
Automatic windforce compensation controls. Trolley gear.Electrical Equipment
Multivoltage equipment for supplies from 380 V to 460 V at 50/60 cycles. Electronic safety crane controls with bus technology. Incremental absolute encoders for all operating movements. Electronic load measuring device at basic jib section. Multilingual graphic display showing information to operator, both operational and diagnostics.
Safety Devices
Electronic overload protection system. Increased load moment
limitation by automatically hoisting speed reduction. Menu guided setting of overload protection system and of all limiters from operators cabin. Working space limiter. Anti collision interface. Trolley rope breakage safety device.Tower Elements, Climbing Device
Tower configuration of WOLFF system tower elements. WOLFF slug bolt connection. Detachable hydraulic WOLFF system climbing device KWH 20.3.
Undercarriage UW
WOLFF system undercarriage UW can be used with gauge from 5,0 up to 8,0 m.
Cross Frame Element KRE, Cross Frame KR
For stationary installation. KRE elements can be modified to UW.
Power Requirements and hook paths (Slewing part)
62 kVA (Hw 845 FU), hook path 190 m in 2-fall operation.
90 kVA (Hw 875 FU), hook path 460 m in 2-fall operation.